Заказ на фриланс · Дизайн
STOL Aircraft Structural Design Package
- Бюджет: 273 943 ₽ – 547 886 ₽
- Раздел: Дизайн
- Опубликован: (МСК)
Title: Aircraft structural engineer: welded 4130 STOL frame, full design package (paid trial first)
Budget: AUD $4,000–10,000 total, paid by milestone
Description:
I’m building one two-seat STOL taildragger (600 kg MTOW, amateur-built, Australia, 19-series approval). It has a welded 4130 tube fuselage, a strut-braced wing, a 7075 aluminum spring gear bar and fabric covering. The layout is modelled in CAD and I have a first-pass beam analysis, a weights and CG ledger, a fittings schedule and a control system sheet.
I need an experienced aircraft structural engineer to take it from layout to build-ready design. This is a staged job, paid per milestone. You can be paid for stage 1 and stop there, and so can I.
Stages
Paid trial (AUD $100–250, fixed): design and check the lift-strut lower lug at the fuselage hoop. Deliver a one-page hand calculation (double shear, bearing, bypass, bolt bending, lug tear-out, tube and weld check, margins of safety), a simple fabrication drawing, and a short note on any assumptions or load problems you find.
Structural review and tube sizing: frame, wing, gear and tail. Fixed price quoted after stage 1.
Fittings and control systems: wing root and strut fittings, gear saddle, engine mount, hinges, stick, pedals, cables, pushrods, pulleys, trim and flaps. Fixed price quoted after stage 2.
Fabrication drawings and approval documents: weld jig drawings, parts and hardware list, and stress documentation for RA-Aus 19-series approval. Fixed price quoted after stage 3.
The full job is intended for the stage 1 winner, subject to the quality of their work. I can end the contract after any stage. All drawings, calculations and source files are mine.
You must include in your bid (bids without these will not be considered):
The name or type of an aircraft you have analysed or designed.
Whether you have worked on welded 4130 tube structures.
2–3 sentences: how do you account for weld heat-affected zones and joint efficiency when sizing a 4130 cluster joint?
Who signs your calculations, with their qualification, and what standard you work to (FAA, EASA, RA-Aus, other).
A redacted page from a stress report or a drawing from past aircraft work.
I’ll supply: a one-page trial brief with loads and geometry. After the trial, the CAD/STEP model, the beam screening report and the design brief.
Not wanted: generic bids, 3D modelling or rendering only, and anyone who can’t take responsibility for their structural calculations.
Похожие заказы
- Для постоянного сотрудничества ищем дизайнераБюджет по договорённости · 26.11.2026
- Polished Word Document Transcription20 578 ₽ – 61 735 ₽ · 26.11.2026
- Custom Two-Storey Home Design40 708 ₽ – 81 416 ₽ · 26.11.2026
- Henley Sweatshirt Tech Pack Creation1 080 ₽ – 2 159 ₽ · 26.11.2026
- Canopy Load & Support Design2 469 ₽ – 20 578 ₽ · 26.11.2026
- ASAP App Graphics Design823 ₽ – 82 313 ₽ · 26.11.2026
- Дизайн50 ₽ · 26.11.2026
- Дизайн футболокдо 1 000 ₽ · 25.11.2026